I made pretty good progress on the drainage upgrade today. I remember tunneling under the driveway in Port St. John many years ago. It was about 12 feet and took me less than half an hour. That was Florida and it was sand. The 30 inch sidewalk took a lot longer than 30 minutes. This is Kentucky and it is not sand.
I laid everything out and decided I needed to modify the catch basin. The white PVC has to go under the sidewalk. |
It only had two holes. |
So I cut a third hole. This one is for the downspout ingress. |
I had to dig the trench to take the length of the pipe first so it could go under at the right angle. Downhill is to the left. |
I'll put the stone in tomorrow. It wsa supposed to rain tonight and I wanted to watch the water drain out before burying it. |
There is still some finish work left but the hard part should be over. |